Luma Intelligence · Demo A · Site finderprototype

Where in Vransko can we build an apartment building with ten apartments?

Method: national building-land evidence for Vransko, public display version, snapshot 2026-09-18 → serviced, plan-compliant residential land ≥ 1,200 m² → open-data checks → AI-assisted assessment

53serviced, plan-compliant residential units (stage 5, SS + SK)
15candidate sites ≥ 1,200 m² after merging touching units
5top sites with an AI-assisted assessment
16/27web citations verified by the checker (8 partly, 3 not opened)
$7.92inference cost of this run (10 agent runs)

Ranked site cards

#1

Site 10 · residential (SS) · 2,074 m²

Planning unit VR13-1g/SS4 · parcels 71/1, 71/2, 71/3 · 3 merged units · development stage 5 (serviced, plan-compliant)

Prototype screening, AI-assisted: rank 1, score 13/15 — serviced SS site of 2,074 m² within a 4-minute walk of the centre; planning limits, flood exposure and heating connection still to verify.

13/ 15screening score

Access estimated, straight-line × 1.3

Bus stop
9 min (529 m, Vransko)
Centre
4 min (249 m, Vransko)
Town hall
9 min (572 m, Občina Vransko)

Source: OpenStreetMap contributors · medium (frequency and pavements unknown)

Services estimated, straight-line × 1.3

Primary school
3 min (176 m, Osnovna šola Vransko)
Kindergarten
3 min (208 m, Vrtec)
Health centre
9 min (524 m, Zdravstveni dom)
Pharmacy
9 min (532 m, Lekarna)
Shop
8 min (464 m, Trgovina Jager)

Source: OpenStreetMap contributors · medium

Site

Utilities
water yes · sewer yes · electricity yes · public road yes
Slope
9.4 % moderate (8-15 %), facing N, 349 m a.s.l.
Long axis
north-south (bbox 51 × 79 m)
Flood exposure
not checked in this screening

Sources: national building-land evidence · high; public 1 m DEM (ARSO), 5-point sample · low

Capacity for ten apartments

Gross floor area
950–1,150 m²
Footprint at 3 floors
320–380 m²
Site coverage
15–18 % of 2,074 m² (adequate)

floor-area ratio and height limits per the municipal plan to be checked (plan text is not structured data)

Score breakdown · 13 of 15
bus stop2/3
centre2/2
school1/1
kindergarten1/1
health1/1
shops1/1
size fit2/2
slope1/2
utilities1/1
land use1/1

access (bus 0-3, centre 0-2) + services (school, kindergarten, health, shops 0-1 each) + size fit (0-2) + constraints (slope 0-2, utilities 0-1, land use SS 1 / SK 0.5)

AI-assisted assessment prototype · claude-sonnet-5-5

Mobility and accessibility
  • Bus stop 'Vransko' is 529 m (about 9 min walk, estimated straight-line × 1.3) away and the centre 249 m (4 min), giving a bus score of 2 of 3. high

    • screening data Distances and estimated walking minutes to bus stop Vransko and the centre come from the supplied OpenStreetMap-based screening.
  • Municipal timetable (published 16 Feb 2024) lists Vransko–AP Celje departures from 04:50 to 21:26 and returns 04:50–20:10, with school-term, weekday and weekend variants; hourly weekday frequency was not extracted. medium

  • AP Ljubljana shows only three Ljubljana–Vransko departures on Sunday 11 Oct 2026 (15:30, 20:10, 20:45; about 1 h 05–1 h 13), so the Ljubljana link looks sparse at weekends; weekdays unchecked. medium

    • verified AP Ljubljana — Timetable for 11 Oct 2026 lists three departures to Vransko with durations of 1 h 5 min to 1 h 13 min.
  • Shop, health centre, pharmacy and townhall lie 464–572 m (8–9 min) away and the slope is a moderate 9.4 %; pavements, crossings and street lighting could not be verified. medium

    • screening data Distances to shop 464 m, health 524 m, pharmacy 532 m, townhall 572 m and slope 9.4 % moderate class.
Social infrastructure
  • Osnovna šola Vransko is 176 m (3 min) and the kindergarten 208 m (3 min) away, so the ten apartments sit directly beside school and childcare; free places were not checked. high

    • screening data School 176 m / 3 min and kindergarten 208 m / 3 min, estimated straight-line × 1.3.
  • Zdravstveni dom is 524 m (9 min) and the pharmacy 532 m (9 min) away; the range of services and opening hours are not in the supplied data. high

    • screening data Health centre 524 m / 9 min and pharmacy 532 m / 9 min.
  • Trgovina Jager is the nearest shop at 464 m (8 min walk); range, opening hours and any second grocery option were not verified beyond OpenStreetMap. medium

    • screening data Shop Trgovina Jager 464 m / 8 min, OSM way/236775610.
  • Ten apartments add a modest number of households to a municipality of about 2,600 inhabitants; centre (249 m) and townhall (572 m) are within a 9-minute walk. medium

    • screening data Municipality about 2,600 inhabitants; centre 249 m / 4 min; townhall 572 m / 9 min.
Climate, energy and materials
  • Site at 349 m faces north with a 9.4 % slope; the 51 × 79 m plot allows an east–west bar of 320–380 m² footprint with south-facing living rooms, but shading was not modelled. medium

    • screening data Elevation 349 m, slope 9.4 % facing N, bounding box 51 × 79 m, footprint 320–380 m².
  • Vransko has had a wood-biomass district heating system since 2004, extended in 2012 with 850 m² solar-thermal collectors; whether parcels 71/1–71/3 can connect to the network is not verified. medium

    • verified Municipality of Vransko (mojaobcina.si) — District heating established in 2004 on wood biomass; 850 m² solar collectors opened 11 May 2012.
    • partly supports RTV SLO — Vransko heats on wood biomass and most households in the municipality are connected.
  • Energetika Projekt d.o.o. (Vransko 66) published the wood-biomass heat tariff (Uradni list RS 106/2006); a network of roughly 9–11 km and 126–168 users appears only in search excerpts, unverified. low

    • verified Uradni list RS 106/2006 — Price list for wood-biomass district heating in Občina Vransko issued by Energetika Projekt d.o.o., Vransko 66.
    • could not open DIIP DOLB Miren (search excerpt) — Search excerpt reports Vransko network length 10,800 m, 168 users and 2010 Brode extension; PDF text could not be read in this run.
  • A three-storey timber frame in glulam or CLT with wood-fibre insulation and timber façade suits the 950–1150 m² gross floor area; fire, acoustic and structural suitability for ten apartments needs engineer design. medium

    • screening data Three assumed floors and 950–1150 m² gross floor area for ten apartments.
  • Directory listings show KAR-LES (glued and construction timber, Šempeter v Savinjski dolini) and Henrik Tominšek d.d.k. (glued timber, Rečica ob Savinji) in the Savinja valley; distance, CLT output and wood-fibre suppliers unverified. low

    • verified MojMojster directory — Lists KAR-LES (est. 2009) and Henrik Tominšek d.d.k. as glued and construction timber suppliers near Šempeter v Savinjski dolini.
    • verified MojMojster directory (Braslovče) — Lists Henrik Tominšek d.d.k. and URLES among construction-timber suppliers around Braslovče.
Capacity and constraints
  • A footprint of 320–380 m² on 2,074 m² gives 15–18 % coverage; three floors and 950–1150 m² gross floor area equal about 95–115 m² gross per apartment, size fit adequate. high

    • screening data Capacity block: 10 apartments, 950–1150 m² GFA, footprint 320–380 m², coverage 15–18 %, size fit adequate.
  • Land use is SS in planning unit VR13-1g/SS4 per national building-land evidence, no detailed plan listed; floor-area ratio, height limit and parking norm of the municipal plan (Uradni list RS 38/2008) not retrieved. medium

    • verified Uradni list RS 38/2008 — Odlok o Občinskem prostorskem načrtu Občine Vransko; the retrieved text showed strategic articles only and did not contain unit VR13-1g/SS4.
    • screening data Land use SS, planning unit VR13-1g/SS4, empty detailed-plan list, stage 5.
  • The municipality has a 2026 draft detailed plan for neighbouring unit VR13-1b/SS6, so some SS units apparently need one; whether VR13-1g/SS4 does must be checked with the municipality. low

    • partly supports Municipality of Vransko — April 2026 draft decree for part of unit VR13-1b/SS6; PDF text was not machine-readable in this run.
  • Flood exposure was not checked: no public flood-hazard web service was reachable, so the national flood hazard maps must be consulted before any decision. high

    • screening data Flood status 'not checked in this screening'.
  • A 9.4 % slope (moderate, 8–15 %; indicative 5-point sample of the 1 m model) implies stepped terraces or cut-and-fill; ownership of the three merged parcels and soil are unknown. medium

    • screening data Slope 9.4 %, moderate class, ARSO 1 m model 5-point sample; three parcels 71/1, 71/2, 71/3 merged.
Not established in this screening
  • Floor-area ratio, height limit, storey count and parking norm for SS / VR13-1g/SS4 in the municipal plan (Uradni list RS 38/2008): the SS articles were not retrievable.
  • Whether VR13-1g/SS4 requires a detailed municipal spatial plan before a building permit.
  • Weekday bus frequency and whether the timetable stop 'Vransko' equals the OpenStreetMap stop 529 m away.
  • Whether parcels 71/1–71/3 lie inside the district heating network, plus connection capacity, tariff and exact network length.
  • Flood exposure, soil and ground conditions, and ownership of the three merged parcels.
  • Pavement quality, school and kindergarten free places, CLT producers and wood-fibre insulation suppliers within about 60 km.
#2

Site 12 · residential (SS) · 1,883 m²

Planning unit BR01-1/1 · parcels 632/14, 632/8 · 2 merged units · development stage 5 (serviced, plan-compliant)

Prototype screening: serviced, plan-compliant 1,883 m² residential plot in Brode, 2 min from a bus stop, on an east-facing 14.5 % slope; planning limits, parking norm and flood exposure remain open.

11.5/ 15screening score

Access estimated, straight-line × 1.3

Bus stop
2 min (97 m, Brode)
Centre
18 min (1,109 m, Vransko)
Town hall
14 min (832 m, Občina Vransko)

Source: OpenStreetMap contributors · medium (frequency and pavements unknown)

Services estimated, straight-line × 1.3

Primary school
19 min (1,179 m, Osnovna šola Vransko)
Kindergarten
19 min (1,190 m, Vrtec)
Health centre
15 min (937 m, Zdravstveni dom)
Pharmacy
15 min (935 m, Lekarna)
Shop
13 min (825 m, Mercator)

Source: OpenStreetMap contributors · medium

Site

Utilities
water yes · sewer yes · electricity yes · public road yes
Slope
14.5 % moderate (8-15 %), facing E, 342 m a.s.l.
Long axis
north-south (bbox 40 × 75 m)
Flood exposure
not checked in this screening

Sources: national building-land evidence · high; public 1 m DEM (ARSO), 5-point sample · low

Capacity for ten apartments

Gross floor area
950–1,150 m²
Footprint at 3 floors
320–380 m²
Site coverage
17–20 % of 1,883 m² (adequate)

floor-area ratio and height limits per the municipal plan to be checked (plan text is not structured data)

Score breakdown · 11.5 of 15
bus stop3/3
centre1/2
school0.5/1
kindergarten0.5/1
health1/1
shops0.5/1
size fit2/2
slope1/2
utilities1/1
land use1/1

access (bus 0-3, centre 0-2) + services (school, kindergarten, health, shops 0-1 each) + size fit (0-2) + constraints (slope 0-2, utilities 0-1, land use SS 1 / SK 0.5)

AI-assisted assessment prototype · claude-sonnet-5-5

Mobility and accessibility
  • The Brode bus stop is 97 m away (about 2 min, estimated); the municipal spatial plan names Brode as one of four suburban stops on the Vransko–Celje direction. medium

    • screening data Bus stop Brode at 97 m, 2 min walk, estimated straight-line × 1.3.
    • verified Uradni list RS 38/2008 (OPN Vransko) — Art. 2.7.2 lists suburban bus stops in Vransko, Brode, Čeplje and Prekopa on the Vransko–Celje direction.
  • The municipal timetable (published 16 Feb 2024) lists Vransko–AP Celje departures from 04:50 to 21:26, partly school-term only; Brode is not listed, so frequency at this stop is unknown. medium

  • A third-party route planner reports Ljubljana–Vransko coach service of about 1 h 10 min (stop Ločica pri Vranskem); frequency figures conflicted, so no official Ljubljana connection was confirmed. low

    • verified Rome2rio — Nomago service from Ljubljana bus station to Ločica pri Vranskem, about 1 h 10 min, stated as hourly.
  • Centre is 1,109 m (18 min) and town hall 832 m (14 min), both estimated straight-line × 1.3; pavements, crossings and lighting on this route were not verified. medium

    • screening data Centre 1,109 m / 18 min, townhall 832 m / 14 min, walk times estimated.
Social infrastructure
  • School (1,179 m) and kindergarten (1,190 m) are each about 19 min on foot (estimated), so families will likely rely on the bus or car; school-term bus services exist but capacity is unknown. medium

    • screening data Osnovna šola Vransko 1,179 m / 19 min; Vrtec 1,190 m / 19 min, estimated.
    • partly supports Municipality of Vransko, bus timetable — Several departures are coded as running only during school term.
  • Health centre (937 m) and pharmacy (935 m) are both about 15 min on foot (estimated); GP availability and opening hours were not checked. medium

    • screening data Zdravstveni dom 937 m / 15 min; Lekarna 935 m / 15 min.
  • The nearest food shop (Mercator) is 825 m, about 13 min on foot (estimated), which is the shortest of the daily-service walks for this plot. medium

    • screening data Mercator at 825 m, 13 min, estimated.
  • Ten apartments are a small addition in a municipality of about 2,600 inhabitants; local housing demand, tenure mix and affordability were not researched in this screening. low

    • screening data Municipality of about 2,600 inhabitants on the A1 corridor; capacity set at 10 apartments.
Climate, energy and materials
  • An east-facing 14.5 % slope on a 40 × 75 m plot with its long axis north–south gives morning sun and contour-parallel building; afternoon shading from terrain to the west was not modelled. medium

    • screening data Slope 14.5 %, facing E, elevation 342 m, bbox 40 × 75 m, long axis north-south.
  • Verified: Vransko's wood-biomass district heating (built 2004, operator Energetika Projekt, boilers 2 MW and 1.2 MW, 10.8 km network, 168 users) was extended to Brode in 2010. medium

  • Whether parcels 632/14 and 632/8 are next to the Brode heat main, connection terms and tariff are unknown; heat pump with roof PV is the fallback if connection is not possible. low

  • The network also has about 850 m² of solar collectors (2012) with 100 m³ storage, covering roughly 70 % of summer hot-water demand, so connected buildings get partly solar-based hot water. medium

  • Option: glulam or CLT frame, wood-fibre insulation and timber façade for 950–1,150 m² GFA; verified regional firms are Žaga-Tiples (sawmill, Nazarje) and Rihter (timber builder, Ljubno); distances and CLT/wood-fibre supply unverified. low

    • verified gov.si, wood industry Savinjska region — Names Žaga-Tiples (Nazarje, primary wood processor) and Rihter d.o.o. (Ljubno ob Savinji, low-energy and passive timber buildings).
    • verified Bizi.si company register — Žaga-Tiples: wood processing and timber trade, business unit at Lesarska cesta 10, Nazarje.
Capacity and constraints
  • Ten apartments need 950–1,150 m² gross floor area over three floors; a 320–380 m² footprint covers only 17–20 % of the 1,883 m² plot, leaving room for parking and green space. high

    • screening data GFA 950–1,150 m², 3 floors, footprint 320–380 m², coverage 17–20 %, size fit adequate.
  • The plot lies in planning unit BR01-1/1 (land use SS); the municipal plan lists Brode for housing, but floor-area ratio, height and permitted multi-dwelling building type could not be retrieved from the opened text. medium

  • No parking norm was found for ten apartments; whether a detailed municipal plan applies to BR01 is open, since the plan table flags one for Brode while the site facts list none. low

  • At 14.5 % the slope sits at the top of the 8–15 % class; across the 40 m east–west width this is about 5.8 m of fall, so terracing and a geotechnical survey are likely. medium

    • screening data Slope 14.5 %, class moderate (8-15 %), 1 m DEM 5-point sample, indicative only; width 40 m.
  • Flood exposure was not checked in this screening; national flood hazard maps must be consulted for parcels 632/14 and 632/8 before any decision. high

    • screening data Flood status: not checked in this screening.
Not established in this screening
  • Floor-area ratio, building coverage limit, maximum height/floors and permitted building types for BR01-1/1: the decree's numerical planning-unit conditions were not readable in the fetched text.
  • Parking norm and whether a detailed municipal plan (OPPN) binds this plot.
  • Bus frequency at Brode stop, pavements, crossings and street lighting; current official timetable for Brode.
  • Whether parcels 632/14 and 632/8 can connect to the Brode district heating main, plus tariff and connection terms.
  • Flood hazard, soil and groundwater conditions, slope stability, and ownership/encumbrances of the two parcels.
  • Distance and capacity of regional glulam/CLT and wood-fibre insulation suppliers (only a sawmill and a timber builder were verified).
#3

Site 1 · residential (SS) · 5,721 m²

Planning unit BR01-1/1 · parcels 639/16, 639/17, 639/18, 639/80 · 4 merged units · development stage 5 (serviced, plan-compliant) · detailed plan: adopted · Ureditveni načrt za obrtno-stanovanjsko cono Brode

Prototype AI-assisted screening: flat, serviced 5,721 m² residential site with a bus stop 132 m away; ten apartments fit easily, but services are 16–23 minutes' walk and plan limits are unverified.

10.5/ 15screening score

Access estimated, straight-line × 1.3

Bus stop
2 min (132 m, Brode)
Centre
21 min (1,310 m, Vransko)
Town hall
16 min (1,014 m, Občina Vransko)

Source: OpenStreetMap contributors · medium (frequency and pavements unknown)

Services estimated, straight-line × 1.3

Primary school
22 min (1,381 m, Osnovna šola Vransko)
Kindergarten
23 min (1,385 m, Vrtec)
Health centre
18 min (1,112 m, Zdravstveni dom)
Pharmacy
18 min (1,108 m, Lekarna)
Shop
16 min (1,008 m, Mercator)

Source: OpenStreetMap contributors · medium

Site

Utilities
water yes · sewer yes · electricity yes · public road yes
Slope
1.7 % flat (< 3 %), facing NW, 329 m a.s.l.
Long axis
compact (no dominant axis) (bbox 120 × 103 m)
Flood exposure
not checked in this screening

Sources: national building-land evidence · high; public 1 m DEM (ARSO), 5-point sample · low

Capacity for ten apartments

Gross floor area
950–1,150 m²
Footprint at 3 floors
320–380 m²
Site coverage
6–7 % of 5,721 m² (generous)

floor-area ratio and height limits per the municipal plan to be checked (plan text is not structured data)

Score breakdown · 10.5 of 15
bus stop3/3
centre0/2
school0.5/1
kindergarten0.5/1
health0.5/1
shops0.5/1
size fit1.5/2
slope2/2
utilities1/1
land use1/1

access (bus 0-3, centre 0-2) + services (school, kindergarten, health, shops 0-1 each) + size fit (0-2) + constraints (slope 0-2, utilities 0-1, land use SS 1 / SK 0.5)

AI-assisted assessment prototype · claude-sonnet-5-5

Mobility and accessibility
  • Bus stop "Brode" is 132 m away (about 2 min walk, estimated); a Nomago notice confirms a stop of this name exists, but service frequency at this stop was not established. medium

    • screening data Bus stop Brode at 132 m, 2 min estimated walk (straight-line × 1.3).
    • partly supports Nomago notices — Notice says the Brode stop was temporarily inactive 14–15 July 2026 because of a full road closure Brode–Vransko.
  • The Vransko–AP Celje timetable lists about 25 departures a day (04:50–21:26) for Vransko, but does not show which of them call at Brode, so frequency here stays unverified. low

  • Centre is 1,310 m (21 min) and town hall 1,014 m (16 min) on estimated walks; the centre scores 0 of 2, so errands will mix walking, bus and car. Pavements are unknown. medium

    • screening data Centre 1,310 m / 21 min, town hall 1,014 m / 16 min, centre score 0; pavements not in the data.
  • The municipality lies on the A1 corridor Ljubljana–Celje, so car commuting is likely; the distance to the nearest motorway junction and capacity of the Brode–Vransko road link were not measured. low

    • screening data Context: small municipality of about 2,600 inhabitants on the A1 motorway corridor Ljubljana–Celje.
Social infrastructure
  • School (1,381 m, 22 min) and kindergarten (1,385 m, 23 min) are estimated walks beyond easy child range; daily trips likely need the 132 m bus stop or car drop-off. School transport arrangements are unknown. medium

    • screening data Osnovna šola Vransko 1,381 m / 22 min; Vrtec 1,385 m / 23 min; scores 0.5 each.
  • Health centre (1,112 m, 18 min) and pharmacy (1,108 m, 18 min) lie in Vransko centre, reachable on foot but not short; opening hours and doctor capacity were not checked. medium

    • screening data Zdravstveni dom 1,112 m / 18 min; Lekarna 1,108 m / 18 min; score 0.5 each.
  • The nearest food shop, Mercator, is 1,008 m (16 min) away; it was the only shop identified in OpenStreetMap, and range of goods and opening hours are unknown. medium

    • screening data Mercator 1,008 m / 16 min, shops score 0.5; OpenStreetMap node/2534964728.
  • Brode had 195 residents in the 2002 census; ten apartments (assumed 2–3 persons each) would add roughly 10–15 % to a small settlement whose services are all in Vransko centre. medium

Climate, energy and materials
  • Compact 120 × 103 m footprint (ratio 1.17) with a 1.7 % NW-facing slope at 329 m: slope is too gentle to limit solar, so building orientation and roof pitch can be set freely; terrain shading was not modelled. medium

    • screening data Orientation compact (bbox 120 × 103 m, ratio 1.17); slope 1.7 %, facing NW, elevation 329 m, ARSO 1 m DEM indicative.
  • Verified: Energetika Projekt d.o.o. Vransko runs district heating with wood biomass in Vransko municipality; its tariff was published in Uradni list RS 5/2006, effective 15 December 2005. high

    • verified Uradni list RS 5/2006 — Price list of Energetika Projekt d.o.o. Vransko for district heating with wood biomass, effective 15 December 2005.
    • partly supports Uradni list RS 106/2006 — Later price list by the same operator for wood-biomass district heating.
  • Network extent is only partly verified: operating instructions (2011, 2020) cover part of Vransko settlement; the 2006 Brode plan amendment (Art. 15) foresaw a new biomass heat station, but connection of this site is unconfirmed. low

    • verified Uradni list RS 2011 — System operating instructions cover the area of part of Vransko settlement; operator Energetika Projekt d.o.o.
    • verified Uradni list RS 97/2006 — Art. 15 foresees district heating through a new biomass heat station; heat pumps and solar collectors allowed if economic.
  • The original 2003 Brode plan allowed only individual oil, LPG or coal heating; the 2006 amendment replaced this with district heating, so heating choice for this site follows the amended plan. medium

  • Bio-based option: CLT or glulam frame, wood-fibre insulation, timber façade. Stilles d.o.o. in Sevnica is a verified CLT producer (distance not verified); Savinjska sawmills and local wood-fibre supply were not verified. low

    • verified Stilles — Stilles d.o.o., Savska cesta 13, Sevnica, manufactures CLT buildings at its Sevnica facility.
    • verified Stilles CLT news — Confirms Stilles CLT panels used in several projects; no capacity or timber-source data.
Capacity and constraints
  • Ten apartments need 950–1,150 m² gross floor area; a 320–380 m² footprint on three floors covers only 6–7 % of 5,721 m², so size fit is generous and spare land remains. high

    • screening data Capacity: 950–1,150 m² GFA, 320–380 m² footprint, 3 floors, 6–7 % coverage, size fit generous.
  • The adopted Brode plan amendment (Uradni list RS 97/2006) provides free-standing multi-apartment blocks of K+P+2, optionally with penthouse, with 9 or 11 apartments each; this matches three floors and ten apartments. medium

    • verified Uradni list RS 97/2006 — Objects A, B and C are multi-apartment K+P+2 blocks, up to penthouse, with 9 or 11 apartments; parcel 639/16 is listed.
    • partly supports Uradni list RS 44/2006 — Programme foresees about 16 villa-block objects in a roughly 21,000 m² area.
  • Parking: the 2006 plan puts garages under building clusters plus surface spaces but states no per-apartment ratio; of the site's parcels only 639/16 was confirmed in the retrieved list, and the municipal parking norm was not found. low

    • verified Uradni list RS 97/2006 — Underground garages under building clusters; no explicit parking ratio per apartment; no explicit coverage percentage.
  • The municipal spatial plan decree (Uradni list RS 38/2008) lists BR01-1 but the retrieved text gave no numeric floor-area ratio, coverage or height limit; the planner must check the implementation tables. medium

    • verified Uradni list RS 38/2008 — Lists Brode as BR01-1; retrieved text contains no numeric FZ, FI, height or parking values.
  • Slope is 1.7 % (flat, class below 3 %, indicative from a 5-point sample); flood exposure was not checked and the national flood hazard maps must be consulted before any decision. high

    • screening data Slope 1.7 %, flat; flood status not checked in this screening.
Not established in this screening
  • Numeric floor-area ratio, site coverage, height limit and parking norm for BR01-1 in the municipal spatial plan; whether the 2006 detailed-plan provisions still apply unchanged to parcels 639/17, 639/18 and 639/80.
  • Bus frequency and timetable for the stop Brode, and pavement, lighting and crossing quality on the walks to the centre and school.
  • Whether the district heating network reaches this site, and connection capacity, cost and timing; whether the 2006 biomass heat station for the zone was built.
  • Flood exposure (national flood hazard maps), soil and ground-water conditions, ownership and parcel constraints.
  • Distance and capacity of any glulam, CLT or sawmill supplier within about 60 km in the Savinjska region, and a local wood-fibre insulation supplier.
#4

Site 2 · residential (SS) · 4,319 m²

Planning unit BR01-1/1 · parcels 639/14, 639/15, 639/83, 639/9 · 4 merged units · development stage 5 (serviced, plan-compliant) · detailed plan: adopted · Ureditveni načrt za obrtno-stanovanjsko cono Brode

Prototype screening: serviced, plan-compliant 4,319 m² site with a bus stop 1 min away and gentle slope; services are 16–22 min walk, and floor-area, parking and flood rules remain unchecked.

10.5/ 15screening score

Access estimated, straight-line × 1.3

Bus stop
1 min (81 m, Brode)
Centre
21 min (1,302 m, Vransko)
Town hall
16 min (1,014 m, Občina Vransko)

Source: OpenStreetMap contributors · medium (frequency and pavements unknown)

Services estimated, straight-line × 1.3

Primary school
22 min (1,373 m, Osnovna šola Vransko)
Kindergarten
22 min (1,381 m, Vrtec)
Health centre
18 min (1,115 m, Zdravstveni dom)
Pharmacy
18 min (1,112 m, Lekarna)
Shop
16 min (1,008 m, Mercator)

Source: OpenStreetMap contributors · medium

Site

Utilities
water yes · sewer yes · electricity yes · public road yes
Slope
4.1 % gentle (3-8 %), facing NE, 327 m a.s.l.
Long axis
compact (no dominant axis) (bbox 113 × 93 m)
Flood exposure
not checked in this screening

Sources: national building-land evidence · high; public 1 m DEM (ARSO), 5-point sample · low

Capacity for ten apartments

Gross floor area
950–1,150 m²
Footprint at 3 floors
320–380 m²
Site coverage
7–9 % of 4,319 m² (generous)

floor-area ratio and height limits per the municipal plan to be checked (plan text is not structured data)

Score breakdown · 10.5 of 15
bus stop3/3
centre0/2
school0.5/1
kindergarten0.5/1
health0.5/1
shops0.5/1
size fit1.5/2
slope2/2
utilities1/1
land use1/1

access (bus 0-3, centre 0-2) + services (school, kindergarten, health, shops 0-1 each) + size fit (0-2) + constraints (slope 0-2, utilities 0-1, land use SS 1 / SK 0.5)

AI-assisted assessment prototype · claude-sonnet-5-5

Mobility and accessibility
  • Bus stop 'Brode' is 81 m away (about 1 min walk, estimated); OpenStreetMap shows no shelter, bench or tactile paving, and Nomago lists Brode as an operating stop. high

    • partly supports OpenStreetMap — Node 'Brode' is a highway=bus_stop with shelter, bench, bin and tactile paving all tagged 'no'.
    • verified Nomago — Notice that the Brode stop is temporarily inactive 14–15 July 2026 because of a Brode–Vransko road closure.
    • screening data Stop Brode at 81 m, 1 min estimated walk.
  • Municipal timetable pages (2024) show 11 departures each way between Vransko and AP Celje in school holidays, first 04:50, but do not name Brode; frequency at this stop is unconfirmed. medium

  • Vransko centre is 1,302 m (about 21 min walk, estimated) and the town hall 1,014 m (16 min), so the centre scores 0 of 2 and everyday trips need bus, bicycle or car. high

    • screening data Centre 1,302 m / 21 min, town hall 1,014 m / 16 min, straight-line × 1.3; centre score 0.
  • The bus stop and the site share the Brode–Vransko road, which the 14–15 July 2026 closure notice shows is the stop's only named link; pavements or cycle lane along it are not known. low

    • verified Nomago — Brode stop inactive because of full closure of the Brode–Vransko road.
    • screening data Public road available on all four parcels; walking times are estimates.
Social infrastructure
  • Osnovna šola Vransko is 1,373 m and the Vrtec 1,381 m away, both about 22 min walk (estimated); too far for children to walk alone, each scoring 0.5 of 1. high

    • screening data School 1,373 m / 22 min, kindergarten 1,381 m / 22 min, score 0.5 each.
  • Zdravstveni dom (1,115 m) and Lekarna (1,112 m) are both about 18 min walk, estimated, outside a typical 10-minute catchment; older residents would rely on the bus 81 m away. high

    • screening data Health 1,115 m / 18 min, pharmacy 1,112 m / 18 min, score 0.5 each.
  • Mercator is 1,008 m away (16 min walk, estimated), the closest service; all five services sit 1.0–1.4 km away in Vransko, so one safe walking or cycling link would serve them all. medium

    • screening data Shop 1,008 m / 16 min; services between 1,008 and 1,381 m.
    • partly supports OpenStreetMap — Stop data shows only a bare roadside stop; link quality to Vransko is not mapped.
Climate, energy and materials
  • Slope is 4.1% facing NE at 327 m, so winter sun is weaker on this aspect; place living rooms and balconies south-east to south-west. The plan sets maximum building lines (Article 6), limiting freedom. medium

    • screening data Slope 4.1% gentle, facing NE, elevation 327 m, compact 113 × 93 m plot.
    • partly supports Uradni list RS 97/2006 — Facade articulation allowed up to maximum building line; roofs flat or slightly pitched.
  • Energetika Projekt d.o.o. (Vransko 66) operates wood-biomass district heating in Vransko, with tariffs published from December 2005; the 2006 Brode plan (Article 15) foresees a new biomass heating substation for this zone. high

    • verified Uradni list RS 5/2006 — Energetika Projekt d.o.o. price list for wood-biomass district heating, effective 15 December 2005.
    • partly supports Uradni list RS 97/2006 — Article 15: district heating on wood biomass through a new heating substation.
  • Whether this site's parcels are actually connected, or the Brode substation was built, could not be verified; the plan also allows heat pumps and solar collectors with municipal approval. low

  • A three-storey cross-laminated or glulam timber frame on a concrete cellar, with wood-fibre insulation and timber façade, suits the plan's K+P+2 typology; wood is among its listed façade materials. medium

    • partly supports Uradni list RS 97/2006 — Villa blocks cellar, ground floor and two floors; facades in wood, plaster, concrete, glass.
    • screening data Three floors assumed, footprint 320–380 m².
  • Directories list glulam and construction-timber suppliers near Mozirje (Henrik Tominšek d.d.k., Rečica ob Savinji; Franc Ogradi s.p.), roughly 30–45 km away by my estimate; CLT and wood-fibre insulation producers are not verified. low

    • partly supports Mojmojster directory — Henrik Tominšek d.d.k. and Franc Ogradi s.p. listed for construction timber and glulam.
    • verified gov.si — Names Žaga-Tiples (Nazarje) as primary processor and Rihter (Ljubno) as timber low-energy builder.
Capacity and constraints
  • Ten apartments need 950–1,150 m² gross floor area on a 320–380 m² footprint over three floors, which is 7–9% coverage of 4,319 m²; size fit is 'generous'. high

    • screening data Capacity 950–1,150 m² GFA, footprint 320–380 m², coverage 7–9%, size fit generous.
  • The 2006 Brode plan decree provides villa blocks of cellar, ground floor and two floors (plus penthouse) with 9 or 11 apartments each, matching the assumed three floors; it gives no floor-area ratio. medium

    • partly supports Uradni list RS 97/2006 — Article 5: multi-dwelling objects K+P+2, 9 or 11 apartments; no zazidanost or utilisation factor given.
    • verified Uradni list RS 2006 programme — Amendment purpose: new multi-dwelling villa blocks on undeveloped northern and western land.
  • No numeric parking norm was found; the plan shows underground garages under building groups and surface visitor parking, so the requirement for ten apartments is unknown and must be checked. medium

  • Parcels 639/14, 639/15 and 639/9 appear in the 2006 decree's parcel list, 639/83 does not; OPN 38/2008 lists Brode as BR01-1, but its SS limits (FZ/FI, height) were not found. medium

  • Flood exposure was not checked; the 4.1% slope is indicative from a 1 m model; SS land use and water, sewer, electricity and road on all parcels come from national building-land evidence. high

    • screening data Flood status 'not checked'; slope method indicative; utilities true for all units; land use SS, stage 5.
Not established in this screening
  • Floor-area ratio (FZ/FI), height limit in metres and parking norm for BR01-1/1 (SS): not found in the readable OPN text; check the consolidated OPN and municipal spatial information system.
  • Whether the 2006 Brode decree applies unchanged beside OPN 38/2008 and later corrections; parcel 639/83 is not in the decree's parcel list.
  • Flood hazard, soil and groundwater, ownership and noise from the A1 motorway were not assessed.
  • Pavements, cycle links and actual bus frequency at the Brode stop; the timetable pages found do not name Brode.
  • Whether this site is connected to Vransko's biomass district heating, plus plant capacity and network length; figures seen only in a search summary whose PDF could not be read were not used.
  • CLT production and wood-fibre insulation supply within about 60 km are not verified; supplier distances are my estimates and stock or lead times are unknown.
#5

Site 5 · residential (SS) · 3,427 m²

Planning unit DR13-2 · parcels 409/2, 415 · 2 merged units · development stage 5 (serviced, plan-compliant)

AI-assisted prototype screening: serviced SS land fits ten apartments at 9–11% coverage, but a 33% east-facing slope, 14-min bus walk and unchecked flood and plan limits make it conditional.

10.5/ 15screening score

Access estimated, straight-line × 1.3

Bus stop
14 min (891 m, Vransko)
Centre
10 min (640 m, Vransko)
Town hall
16 min (965 m, Občina Vransko)

Source: OpenStreetMap contributors · medium (frequency and pavements unknown)

Services estimated, straight-line × 1.3

Primary school
9 min (570 m, Osnovna šola Vransko)
Kindergarten
10 min (613 m, Vrtec)
Health centre
15 min (928 m, Zdravstveni dom)
Pharmacy
15 min (935 m, Lekarna)
Shop
14 min (833 m, Trgovina Jager)

Source: OpenStreetMap contributors · medium

Site

Utilities
water yes · sewer yes · electricity yes · public road yes
Slope
33.1 % steep (> 15 %), facing E, 360 m a.s.l.
Long axis
north-south (bbox 62 × 100 m)
Flood exposure
not checked in this screening

Sources: national building-land evidence · high; public 1 m DEM (ARSO), 5-point sample · low

Capacity for ten apartments

Gross floor area
950–1,150 m²
Footprint at 3 floors
320–380 m²
Site coverage
9–11 % of 3,427 m² (generous)

floor-area ratio and height limits per the municipal plan to be checked (plan text is not structured data)

Score breakdown · 10.5 of 15
bus stop1/3
centre2/2
school1/1
kindergarten1/1
health1/1
shops0.5/1
size fit2/2
slope0/2
utilities1/1
land use1/1

access (bus 0-3, centre 0-2) + services (school, kindergarten, health, shops 0-1 each) + size fit (0-2) + constraints (slope 0-2, utilities 0-1, land use SS 1 / SK 0.5)

AI-assisted assessment prototype · claude-sonnet-5-5

Mobility and accessibility
  • Bus stop "Vransko" is 891 m away, about 14 min on foot (straight-line × 1.3 estimate); the screening scores it 1 of 3, so daily car dependence is likely. medium

    • screening data Bus stop Vransko 891 m, 14 min estimated walk, OSM node/2098926758, bus score 1.
  • A municipal timetable page (published 16 Feb 2024) lists 23 departures Vransko→AP Celje and 26 back, with weekday, weekend and school-day variants; current Nomago/Arriva timetable and Saturday frequency not confirmed. medium

  • The route planner Rome2rio shows a Nomago service Ljubljana AP–Ločica pri Vranskem of about 1 h 10 min; the stated hourly frequency conflicted with another search snippet, so Ljubljana connectivity is unverified. low

    • verified Rome2rio — Nomago, Ljubljana AP to Ločica pri Vranskem, about 1 h 10 min, tickets €3–8, stated hourly.
  • Centre (640 m, 10 min), school (570 m, 9 min) and kindergarten (613 m, 10 min) are walkable on paper; pavements, crossings, lighting and the climb over a 33.1% slope are unknown. medium

    • screening data Centre 640 m/10 min, school 570 m/9 min, kindergarten 613 m/10 min, slope 33.1%, estimated walking times.
Social infrastructure
  • Osnovna šola Vransko (570 m, 9 min) and the Vrtec kindergarten (613 m, 10 min) are both within a 10-minute walk; enrolment capacity and places for new households are unknown. medium

    • screening data School way/246455488 570 m 9 min; kindergarten way/216527717 613 m 10 min, estimated.
  • Zdravstveni dom (928 m, 15 min) and Lekarna (935 m, 15 min) sit at the edge of a comfortable walk; opening hours and GP capacity were not checked. medium

    • screening data Health centre 928 m/15 min, pharmacy 935 m/15 min, OSM-derived, estimated walking time.
  • Only one grocery is in the data, Trgovina Jager at 833 m (14 min), scored 0.5 of 1; daily shopping is walkable but range and opening hours are unverified. medium

    • screening data Shop Trgovina Jager 833 m, 14 min, shop score 0.5.
  • The municipal plan text steers housing to serviced land and denser building in the Vransko and Brode centres; this site, 640 m from the centre, fits that intent for about ten households. medium

    • verified Uradni list RS 38/2008, OPN Vransko — Residential construction directed to areas that can be serviced cheaply; denser building in the urban centre of Vransko and Brode.
    • screening data Centre distance 640 m; all four utilities available.
Climate, energy and materials
  • The slope falls east at 33.1% (about 18°) at 360 m, so mornings are sunny and afternoons likely shaded by the hill; the north-south long axis (62×100 m) follows contours, limiting cut and fill. medium

    • screening data Facing E, slope 33.1%, elevation 360 m, long axis north-south, bbox 62×100 m, 1 m DEM, indicative only.
  • Vransko has a hot-water district heating system run by Energetika Projekt d.o.o. on wood biomass (price lists from 2006; system rules 2010/2020, 90 °C supply); the rules cover "areas of the Vransko settlement". medium

  • Search snippets quote 4.7 MW (3.2 MW biomass plus 1.5 MW oil), 126 connections and a 9,057 m network from about 2005; no opened page confirmed this, nor whether parcels 409/2 and 415 are reachable. low

    • verified RTV SLO — Vransko biomass supply is local farmers plus waste-wood chips; capacity and connection figures not given on this page.
  • If the network does not reach the site, ground- or air-source heat pumps with PV are the realistic fallback for ten apartments; 33% slope complicates ground loops but suits shallow vertical boreholes. low

    • screening data Slope 33.1%, 10 apartments, 950–1,150 m² gross floor area; no verified heat-pump data used.
  • A glulam or CLT frame with wood-fibre insulation and timber façade suits a 3-storey block; Stilles makes CLT in Sevnica (roughly 35–40 km straight-line) and Žaga-Tiples in Nazarje is a sawmill with drying. medium

    • partly supports Stilles — CLT panels produced at Savska cesta 13, Sevnica, including on-site assembly.
    • could not open gov.si, Savinjska timber industry — Names Žaga-Tiples (Nazarje) sawmill and Rihter (Ljubno ob Savinji) low-energy timber buildings.
Capacity and constraints
  • A 320–380 m² footprint uses only 9–11% of the 3,427 m² site; three floors give 950–1,150 m² gross floor area for ten apartments, rated "generous" fit. high

    • screening data Area 3,427 m², footprint 320–380 m², coverage 9–11%, 3 floors, GFA 950–1,150 m², size fit generous.
  • At 33.1% slope, a 12 m deep building implies roughly 4 m level change, so terracing, retaining walls and split-level plans are likely; slope scored 0 and soil or stability is unknown. medium

    • screening data Slope 33.1%, class steep (> 15%), slope score 0; DEM method indicative only.
  • Land use is SS (national building-land evidence), stage 5 serviced, planning unit DR13-2, no detailed plan listed; the 2008 decree text opened gives no numeric floor-area ratio, height or parking for SS or DR13-2. medium

    • verified Uradni list RS 38/2008, OPN Vransko — Text reviewed has no FZ/FI, height or parking values and no DR13 code; conditions apply except where detailed plans are foreseen.
    • screening data Land use SS, stage 5, planning unit DR13-2, detailed_plan empty.
  • Parking norm for ten apartments was not found; on a 33% slope, undercroft or semi-buried parking inside the 320–380 m² footprint versus surface bays on the 3,427 m² plot must be tested. low

    • screening data Plan text not structured data; floor-area ratio and height limits to be checked in the municipal plan.
  • Flood exposure was not checked in this screening; the national flood hazard maps must be consulted before any decision, as must ownership of the two merged parcels 409/2 and 415. high

    • screening data Flood status: not checked; parcels 409/2 and 415 merged, 2 units.
Not established in this screening
  • Binding floor-area ratio, coverage, height/storey limit, parking norm and whether a multi-apartment building is permitted for SS in DR13-2 (current consolidated OPN text and amendments not read).
  • Flood and erosion hazard, soil and slope stability; geotechnical survey needed given 33.1% slope.
  • Whether district heating reaches parcels 409/2 and 415, and verified plant capacity, connections and network length.
  • Current bus timetable at the stop Vransko (frequency, Saturdays and Sundays) and pavement/lighting on the 640–891 m routes.
  • Ownership, easements and boundary/merge status of parcels 409/2 and 415.
  • Availability and price of wood-fibre insulation and glulam/CLT lead times; only Stilles (Sevnica) CLT and Žaga-Tiples sawmill verified.

Other candidates (not assessed in this run): site 3 (SS, 4,018 m², score 9.5), site 8 (SS, 2,683 m², score 9), site 11 (SK, 1,898 m², score 7.5), site 15 (SS, 1,231 m², score 5), site 7 (SK, 2,757 m², score 4.5), site 13 (SK, 1,821 m², score 4.5), site 6 (SS, 3,408 m², score 4), site 4 (SK, 3,477 m², score 3.5), site 9 (SK, 2,591 m², score 3.5), site 14 (SK, 1,348 m², score 2.5).

Sources and citation check

Deterministic inputs: national building-land evidence (municipality of Vransko, public display, snapshot 2026-09-18); OpenStreetMap contributors (ODbL) via the Overpass API, retrieved 2026-10-11; public 1 m digital elevation model (ARSO). Flood exposure: not checked in this screening. Walking minutes: estimated, straight-line × 1.3 at 80 m per minute.

27 web sources cited by the assessors16 verified8 partly support3 could not be opened